Integrated Building Management Systems

E: controls@integratedbms.co.uk

T: (01636) 674 875

Project:  99‐101 Queen Victoria St

Location:  London

M&E Contractor:  Derry Building Services

Completion Date:  September 2004

The new Salvation Army Headquarters and adjoining 8,361m² six storey office building are prominently located between the Millennium Bridge and St Paul’s Cathedral in central London.

TREND IQ3 Excite controllers, in Form 3 MCCs, control all of the heating and ventilation systems, including variable volume Air Handling Units that serve individually controlled floor‐plates.

Several hundred IQL Fan Coil Unit controllers are interfaced to an Ethernet network, passing all of the building’s data to a 963 Supervisor PC, which is accessible worldwide, via the internet.